Ephraim Gully Spill 1

Basin : Donnelly River

Catchment : Donnelly River

The Ephraim Gully Spill 1 site (site code: DR202MANJ4/6081052), was assessed on several occasions; 12-13 June, 13-14 June 2023, 3-4 July 2024 and 9 -10 July 2025.

Only aquatic biota was assessed, using the standard methods from the South West Index of River Condition.

Condition summary

Please contact the River Science Branch for site information.